Kitchen – Cheltenham

A busy family kitchen in need of modernising & some extra storage added.

The old kitchen was completely removed to make way for a new, fresh kitchen.

Bathroom & chimney removal – Longlevens

This project required work to be carried out in 2 rooms to achieve the desired end result. More space was needed in the attached bedroom via the removal of a redundant chimney, that had already been removed from the ground floor below. The bathroom was also to be resized & to a smaller room as the existing space was being wasted.

The adjoining walls of the bathroom & bedroom were removed & stud timber framed walls erected in the new location & the plaster skimmed.

En suite – Tivoli, Cheltenham

This rental property was being renovated ready for new tenants to move in. The target market was young professionals, so a fresh & modern suite was required to suit most tastes.

Bathroom – Tivoli, Cheltenham

This rental property was being renovated ready for new tenants to move in. The target market was young professionals, so a fresh & modern suite was required to suit most tastes.

Bathroom – Swindon Village, Cheltenham

An outdated bathroom that needed renovating. The existing suite, including a block built shower enclosure was removed to make way for a fresh, modern bath, stylish wall hung basin & contemporary close coupled toilet. The flooring is a gloss white, splash-proof laminate floor.

Bathroom – Birdwood, Gloucester

The current bathroom is accessed via 2 bedrooms. The brief was to make a new access hallway so that it was separated from the bedrooms. There was also extensive work required to replace water damaged floorboards and provide extra strengthening timbers to the floor joists.

Bathroom – Tuffley, Gloucester

Existing bathroom suite removed. New suite installed complete with wall and floor tiling. Chrome towel warmer installed to replace leaking convector panel radiator.

Cloakroom – Hardwicke, Gloucester

Existing cloakroom cabinets and basin removed along with carpet. Stud wall constructed and plastered to remove return and create wall for new freestanding vanity cabinet and mandarin stone basin installed. Laminate flooring laid on solid concrete floor with thermal insulation.

Bathroom – Bishops Cleeve, Cheltenham

Family bathroom renovated by removing entire old suite. Above standard sized bath installed with new low level shower tray and bi-fold door. A new basin vanity unit with dark walnut worktop including a concealed cistern and pan complimented by underground style white wall tiles.

Bathroom – Dursley

Bathroom suite in independent living accommodation removed. Low level shower tray with fixed glass panel shower screen installed. Complimented with a vanity basin unit and high level toilet. Non slip floor tiles & hygienic wet wall panels complete the renovation.

Bathroom – Longford, Gloucester

Remove bath & install low level quadrant shower tray & enclosure. Bespoke made glass cabinet top with countertop basin. New warmer plumbed in to existing central heating system. Laminate flooring in place of carpet.

Bathroom – St Marks, Cheltenham

Remove existing bathroom suite. Install new low level shower tray & enclosure. Install new WC on top of water resistant laminate flooring. Fresh wall tiles also applied.

Bathroom – Longford, Gloucester

Remove existing bath & install low level shower tray with hygienic wall panels for ease of access & cleaning. Update worn laminate flooring & install new towel warmer.