Bathroom & chimney removal – Longlevens

This project required work to be carried out in 2 rooms to achieve the desired end result. More space was needed in the attached bedroom via the removal of a redundant chimney, that had already been removed from the ground floor below. The bathroom was also to be resized & to a smaller room as the existing space was being wasted.

The adjoining walls of the bathroom & bedroom were removed & stud timber framed walls erected in the new location & the plaster skimmed.